Page 1

One of the first joints at the Goulburn end of the Crookwell line, with a newish sleeper in place, and some missing track bolts. The fenceline along the top is where the Crookwell line starts. To the right, the main line north to Sydney. IMG_0006.jpg IMG_0007.jpg
The start of the Crookwell line is clearly seen here, disconnected from the main line. IMG_0009.jpg IMG_0011.jpg IMG_0012.jpg
Culvert at 226.694 on the Crookwell line. Disused signal and small embankment approaching 227km on the Crookwell line. IMG_0018.jpg Road overpass at 227km on the Crookwell line.
Looking south along the embankment from 227km towards Goulburn station, on the Crookwell line. 227km signpost on the Crookwell line. Small flood opening, along with misaligned plates at 227km on the Crookwell line. Spots of rain can be seen on the rail. IMG_0024.jpg
The 227km post on the Crookwell line. Rain can be seen in the background. Two railway structures: a viaduct for the main line through to Sydney, and a small cutting in the foreground for the Crookwell line. IMG_0029.jpg IMG_0031.jpg
228km on the Crookwell line. Point levers for a siding can be seen. Point levers at 228km on the Crookwell line. A set of points just past 228km on the Crookwell line. The siding branches to the left. IMG_0037.jpg

Page 1 2 3 Index